Sunday, 15 March 2015

Making Continues


This week was the week of filming. I began on Monday by picking up all the equipment from uni in preparation for the next two days of filming. The first thing I did was to check that everything was fully functional and charged as to avoid any problems down the line. Due to the nature of some of our locations in size and accessibility it was decided that a crew of only director, camera and sound would attend, with others on standby if any issues occurred or if anything was needed to be brought to set. When the crew returned from the first days shoot they dropped the equipment back of at mine where we had agreed it would be stored and charged in a secure place. Upon their feedback they mentioned that there had been issues in the planning of transport between the days two locations, as one of the postcodes supplied was incorrect and caused for a big delay in film time whilst they found the right location. Whilst only a minor setback in reflection I would ensure that I had prepared all addresses for locations and map print outs to ensure no mishaps would happen again. The next days shoot went much smoother however and on return the rest of the group was very happy with the resulting footage.

No comments:

Post a Comment